AVELLAFASTTAKEOFF

AVELLA FASTTAKEOFF · SCOPE ENQUIRY

Flooring quantity takeoff with clear measured areas.

Get documented floor areas organised by room and specified finish. The fixed quotation identifies whether the scope includes only floor faces or additional installation components.

Individual trades from $30 AUD including GST · fixed scope quotation before proceeding

What we can assess from your drawings

  • Defined floor-finish zones and room references.
  • Openings, boundaries and deductions supported by the source.
  • Skirting, transitions and other measurable accessories only where drawn and included.
  • A clear distinction between net measured area and any separately agreed purchasing allowance.

What to upload

Upload dimensioned floor plans, the floor-finish schedule and details for transitions, stairs, skirting or wet areas that you need measured.

Scope boundaries

The public Vale example measures physical floor faces only. It does not quantify wet-area tiling, adhesives, preparation, installation components, wastage or stock ordering.

Introductory test offers for 1 residential dwelling, up to 2 storeys and 5 relevant plan sheets per trade, using one current drawing issue. A fixed quote confirms eligibility, included scope, capacity and delivery timing before you proceed. Complex work, unresolved design, revisions and additional sheets receive a separate quote. No payment is taken with an enquiry.

Useful to know

Is the public sample a complete flooring order?

No. It demonstrates native floor-area measurements and their references. Your agreed package is defined after review of your own drawings.

Are waste and pack quantities included?

Only if the quotation identifies an evidenced product and purchasing basis. They are never silently added to measured floor areas.

Need more than one trade? Explore three- and five-trade bundles ↗

Upload your plans.
We measure. You price.

START MY TAKEOFF ↗

Free enquiry · no subscription · agreed scope